Cleveland Metropolitan School District School of the Arts | Moody Nolan, Inc. of Columbus, Ohio
Project Description |
Project Location: | Cleveland, OH |
Project Owner: | Cleveland Metropolitan School District |
Size of Building or Project: | 126123 |
| $31,638,573 |
Year of Completion: | 2015 |
Associate Firm: |
|
Project Team Members: | Curtis J. Moody, FAIA, NCARB, NOMA, LEED AP |
Photographer: | Brad Feinkenopf Feinknopf 104 N. 3rd Street Columbus, OH 43215 bfeinknopf@feinknopf.com (614) 225-0414 |
Landscape Architect: | Jim McKnight McKnight & Associates *Firm Closed |
Civil Engineer: | David Moody, PhD. Moody Engineering (*Previously a part of Moody Nolan) 300 Spruce Street Suite 200 Columbus, OH 43215 dmoody@moody-eng.com (614) 280-8999 |
Structural Engineer: | Halim Saab, PE Barber & Hoffman 2217 E. 9th Street Suite 350 Cleveland, OH 44115 hsaab@barber@hoffman.com 216-875-0100 |
MEP Engineer: | Paul Westlake, Jr., FAIA, FACHA Westlake Reed Leskosky 1422 Euclid Avenue Suite 300 Cleveland, OH 44114 pwestlake@WRLdesign.com (216) 522-1350 |
Other: |
Suppliers: | United Glass | Messina Floor Covering | Mull Iron | Tucker Supply |
Cleveland Metropolitan School District School of the Arts
Category
2019 AIA Ohio Design Awards > Category 1: Newly Completed Buildings, Additions, Remodelings, Renovations, Restorations
Description
Firm: Moody Nolan, Inc.
Design Architect
Project Owner: Cleveland Metropolitan School District
Project Location: Cleveland, OH
Share