The Point, Phase 2 | WSA of Columbus, Ohio
Project Description |
| Project Location: | Westerville, Ohio |
| Project Owner: | Otterbein University |
| Size of Building or Project: | 42000 |
| | 4,500,000 |
| Year of Completion: | 2018 |
| Associate Firm: |
|
| Project Team Members: | R. Todd Boyer, AIA Scott Geither Kirsten Sheely, NCIDQ, IIDA Nicole Vice Geoff Gay, Assoc. AIA |
| Photographer: | AJ Brown AJ Brown Imaging 421 19th St, Suite 1 Moline, IL 61265 aj@ajbrownimaging.com 805-450-4892 Cory Klein Cory Klein Photography 134 Grandview Dr Dublin, OH 43017 cwk@corykleinphotography.com 513-383-9655 |
| Landscape Architect: | N/A |
| Civil Engineer: | N/A |
| Structural Engineer: | Dan Geers Jezerinac Geers 5640 Frantz Rd Dublin, OH 43017 dgeers@jgaeng.com (614) 766-0066 |
| MEP Engineer: | Katie Lemler KLH Engineers 444 S Front St Columbus, OH 43215 klemler@klhengrs.com (614) 228-2180 |
| Other: | Peter White White Design Studio 3584 Sunbury Road Galena, Ohio 43021 pete@whitedesignstudio.com 513-720-3730 |
| Suppliers: | Ruscilli Construction Adam Drexel |
The Point, Phase 2
Category
2021 AIA Ohio Design Awards > Category 3: Interior Architecture
Description
Firm: WSA
Design Architect, Architect of Record
Project Owner: Otterbein University
Project Location: Westerville, Ohio
Share